Work Completed Of The Company
OUR PROJECT
| No | Project Name | Years | Clients | Status |
|---|---|---|---|---|
| 1 | HAZOP and HAZID facilitator for TGI tie-in ORF section-2 at Pemping Island | 2017 | PLN BATAM – UBE | Completed |
| 2 | HAZOP Facilitator for “Pemanfaatan Gas Lapangan Bukit Tua Petronas Carigali Ketapang Ltd: Pemasangan Pipa Distribusi Gas Diameter 16” | 2017 | Petrogas Jatim Utama | Completed |
| 3 | Preservation and Pre-Commissioning, Commissioning and Start Up Medco Simenggaris – Tarakan – North Kalimantan | 2017 | JOB Pertamina Medco | Completed |
| 4 | Early Gas HAZOP and Pre Start-up Safety Review for MEDCO Simenggaris – Tarakan – North Kalimantan | 2017 | JOB Pertamina Medco | Completed |
| 5 | Front End Engineering Design (FEED) Re-engineering and Optimization LPG Storage, Tanjung Uban, Batam | 2017 | Pertamina Marketing Operation Region I | Completed |
| 6 | Detailed Engineering Design (DED) of LNG Benoa Regasification Piping, Control System and Risk Assessment | 2017 | PELINDO III | Completed |
| 7 | Pre FEED of Sangatta Biodiesel Facility Development – Facility Improvement, Design and Calculation, including Cost Estimation | 2017 | Petromine Energi (Group Bakrie) | Completed |
| 8 | Pemping – Batam Gas pipeline Commissioning support | 2017 | Batam Trans Gasindo | Completed |
| 9 | FEED Pertamina Musi Timur, LP Compressor Development Project | 2018 | PERTAMINA EP II | Completed |
| 10 | Fit for Services Pipeline Assessment of TD Williamson China | 2018 | TD Williamson China | Completed |
| 11 | Quantitative Risk Assessment (QRA) for Ande-Ande Lumut Project Development | 2018 | Santos | Completed |
| 12 | Engineering Support for Pigging 24” APNA – MMC | 2018 | Lerindro – PHE ONWJ | Completed |
| 13 | HAZOP Sludge Catcher for KRA Platform – Kakap Field | 2018 | Star Energy | Completed |
| 14 | Engineering Support (Process and Process Safety/HAZOP) for Bangka HSD Tank Project | 2018 | Rahardja Wirasakti | Completed |
| 15 | HAZOP Pipeline Semare to Pertagas open Access Project | 2018 | Pertagas | Completed |
| 16 | HAZOP/HAZID for for Jasa Transportasi, Penyimpanan dan Regasifikasi LNG untuk PLTG-PLN Sambera 2 x 20 MW, Kalimantan Timur | 2019 | PLN – Pertagas Niaga | Completed |
| 17 | Engineering & Technical Assessment Service for Supporting The 20” SGP Secondary Repair | 2019 | SAKA Indonesia Pangkah Ltd | Completed |
| 18 | Engineering Support for LNG & CNG Filling Station Project – Benoa, Bali | 2019 | Pelindo Energi Logistik | Completed |
| 19 | PSSR (PreStart-up Safety Review) for Jasa Transportasi, Penyimpanan dan Regasifikasi LNG untuk PLTG-PLN Sambera 2 x 20 MW, Kalimantan Timur | 2020 | PLN – Pertagas Niaga | Completed |
| 20 | Engineering Support for Stasiun Pengumpul Minyak Mentah di Musi Banyuasin, Sumatera Selatan | 2020 | PT. PDPDE | Completed |
| 21 | Detail Engineering Design 4” Pipe Construction Garawangi – PT. KSNI Majalengka | 2021 | PT. Gaspro Sentraco | Completed |
| 22 | HAZID Study Turn Around CO2 Removal PEP Subang | 2021 | PT. Tracon Industri | Completed |
| 23 | DED Debottlenecking FSRU Gas Line Benoa Bali | 2022 | PT. Bali Infra Gas | Completed |
| 24 | FEED Fuel Pipe (Diesel and Avtur) at Area Pengembangan 2 Benoa Bali | 2022 | PT. Rancang Persada | Completed |
| 25 | Turn Around Assessment for LPG Plant Tanjung Uban PT. Pertamina Energi Terminal | 2023 | PT. Synergy Risk Management Consultant | Completed |
| 26 | Detailed Engineering Design for Diesel Fuel Tank Capacity 2500 KL at Fuel Terminal Lhokseumawe PT. Pertamina Patra Niaga | 2023 | PT. Artha Kencana Langgeng | Completed |
| 27 | Detailed Engineering Design for Pipe Construction Menggala Cluster PT. Pertamina Hulu Rokan (PHR) | 2024 | PT. Petronesia Benimel | On Going |
| 28 | Project Management Consultant (PMC) for Construction Fuel Pipe (Diesel and Avtur) at Area Pengembangan 2 Benoa Bali | 2024 | PT. Rancang Persada | On Going |
| 29 | Front End Engineering Design (FEED) Fire Protection Lawe – Lawe for PT. Kilang Pertamina International | 2024 | PT. Synergy Risk Management Consultant | On Going |